Quinta da Várzea

A subdivision of 66 two- to four-bedroom houses on their own plots at Quinta da Várzea, Pontével, delivered in three phases.

In licensing

The place

Pontével, ten minutes from Cartaxo and an hour from Lisbon on the A1. Homes for owner-occupiers from the region and the Lisbon Metropolitan Area.

The project

66

houses

3

phases

34,980 m²

of land

7,908 m²

gross floor area

T2 to T4

unit types

Terraced, semi-detached and detached two-storey houses with an annex, and a shared pool. 8,275 m² transferred to the public domain. Phases of 25, 25 and 16 plots.

How we build

We choose the territory first against defined criteria, design homes suited to the place and to the people who will live there, and build with control and transparency so that the final price makes sense.

Location · Pontével

Regional context · Municipality of Cartaxo, Ribatejo.

Perspectives

Entrada da Quinta da Várzea, com o letreiro em pedra, moradias claras e o arruamento arborizado
Moradia isolada de dois pisos da Quinta da Várzea, com jardim e piscina privativa junto à rua
Jardim privativo com piscina e espreguiçadeiras diante de moradias de dois pisos na Quinta da Várzea
Moradias em banda da Quinta da Várzea sob luz dourada, com jardins frontais e árvores na rua
Rua residencial da Quinta da Várzea ao fim da tarde, com moradias em banda, árvores e passeios
Piscina de uso comum da Quinta da Várzea, rodeada de relva e vegetação, com um caminho de terra em primeiro plano

Illustrative and conceptual images, not binding. The layout and coverage of the plots, the finishes, the outdoor works, the pools and the equipment may differ from what is shown and are subject to the detailed design and the approved budget.

Timeline

  1. 2026

    Acquisition

    Land deed and first capital call.

  2. 2028

    Phase 1

    Works start on plots 1 to 25, road and shared pool.

  3. 2029

    Phase 2

    Plots 26 to 50 and remaining road.

  4. 2031

    Phase 3

    Plots 51 to 66.

  5. 2032

    Completions

    Final completions and final distribution.

Indicative timeline from the business plan.

OPEN FOR INVESTMENT

Open to co-investment. Tickets from €250k.

The investment is made through a company set up exclusively for this project. Memorandum and data room available to qualified investors.

Request the memorandum or learn more about this projectVisit the project website

This is not a public offer or an investment recommendation. Business plan figures, subject to licensing, market conditions and financing.